Posted by Earthr.org Content Team on 25 Aug, 2018
Proposed for the mountainous region on the outskirts of Shenzen, the waste-to-energy plant is expected to incinerate 5,000 tonnes of rubbish per day – approximately one third of the waste generated by the city's 20 million inhabitants each year. The huge circular building will boast a 66,000-square-metre roof, two thirds of which will be covered with photovoltaic panels, allowing the building to generate its own sustainable supply of energy.
3 more Solutions have been suggested for this Problem.